Treasor Specification

Treasor Specification

  • R.C.C framed structure to withstand Wind & Seismic Loads
  • 8” thick CC Blocks for external walls and 4” thick CC Blocks for internal walls
  • INTERNAL : 1 coat of plastering in CM for walls
  • EXTERNAL: 1 coat of plastering in CM for External walls
    • MAIN DOOR:Engineered/Hard wood frame & Designer veneered shutter with reputed hardware fittings with both sides PU polish finishing
    • INTERNAL DOORS:Engineered/Hard wood frame & Designer Veneered/Laminate shutter with reputed hardware fittings with both sides PU polish finishing
    • FRENCH DOORS:UPVC Door frames with float glass with provision for mosquito mesh
    • WINDOWS:Windows with provision for mosquito mesh will be as per Window type and feasibility.
    • * Mosquito mesh & Installation for windows and French doors shall be at Extra Cost )
    • * Grills: Aesthetically designed , M.S grills with Enamel paint finish(Shall be provided at Extra cost as per company design)

 

  • Living,Dining,Master Bedroom and other Bedrooms,Kitchen Areas: Vitrified tiles of Reputed make
  • Balcony:Premium Vitrified tiles of reputed make with matt finish
  • BATHROOMS:Acid Resistant,Anti-skid vitrified tiles of reputed make
  • CORRIDORS:Vitrified Tiles of Reputed make
  • STAIR CASE:Kota/Tandoor/Granite Stone
  • UTILITIES:Ceramic tiles of Reputed make
  • Wall mounted EWC in all bathrooms
  • WashBasins in Dining/balcony area ,Master and Children Toilets
  • Single Lever diverter with shower of reputed make
  • All C.P and Sanitary Fittings of reputed make.
  • Provision for Geysers and Exhaust Fans in all Bathrooms.
  • Internal:Smooth putty finish with 2 coats of Premium Acrylic Emulsion paint of reputed make over a Coat of Primer
  • External:Textured /Luppum finish and two coats of Exterior Emulsion paint of Reputed make Ducts/In between Flats:Two coats of Exterior Emulsion paint of Reputed make over a coat of primer
  • Provision for fixing water purifier, Exhaust fan & chimney
  • Provision for Washing machine in the utility area
  • Power Outlets for geysers and exhaust fans in all bathrooms
  • Power plug for cooking range, chimney, refrigerator, micro wave ovens, mixer / grinders in kitchen
  • Plug points for refrigerator and T.V. where ever necessary. 3 Phase supply for each unit and individual meter boards
  • Distribution Boards and MCBs of premium make
  • Modular Electrical Switches of premium make
  • Power outlets for Air Conditioners in living and all bedrooms.
  • Telephone provision in MBR & Drawing area
  • Provision for internet connection in each flat
  • Provision for cable connection in Master Bedroom, Children’s Bedroom & Living room
  • 10 Passengers automated lift of Reputed make, Entrance with front Granite/marble/Tile cladding
  • 100% DG backup for common areas and inside Flat
  • Fire Systems will be provided as per fire department norms.
  • Provision for Supply of gas from centralised gas bank to all individual flats in kitchen with gas meters.
  • Garbage Chutes will be provided for all towers
  • Domestic water made available through an exclusive water softening plant
  • A Sewage Treatment plant of adequate capacity as per norms will be provided inside the project, treated sewage water will be used for the landscaping and flushing purpose.

Project Progress